completed, the crew leader arranges through the QC for a final inspection with the ROICC and a customer representative. There should be no punch list at this inspection. If there are no discrepancies, beneficial battalion prepares a letter to the ROICC advising that the project has been completed. This transfer letter has two sets of as-built drawings; all installation, operation, maintenance, and other technical service manuals; and parts catalogs. The transfer letter also contains a occupancy is established upon completion of the final statement of actual material cost and statistical labor inspection and the 1-year warranty takes effect. The cost. Figure 5-8 is a sample transfer letter. If the ROICC did not include 2ndNCB/3rdNCB in the distribution of
Figure 5-8. - Project transfer letter.