3-38.
Assemblies are functionally grouped
by numbers so they relate to which
of the following installation
characteristics?
1.
2.
3.
4.
3-39.
How
Occupational Field 13 skills
required
Size of the crew required
Amount of Alfa Company support
required
Amount of supplies on hand
can components or facilities be
tailored?
1.
By specifying requirements for
Tropical or North Temperate
Zones
2.
By deleting or adding
facilities or assemblies
3.
Both 1 and 2 above
4.
By requesting additional
assistance from NAVFAC only
3-40.
In the ABFC system, what code
identifies assemblies required for
use in the North Temperate Zone?
1. T
2. NT
3. N
4. c
IN ANSWERING QUESTION 3-41, REFER TO
FIGURE 4-2 OF THE TEXTBOOK.
3-41.
3-42.
3-43.
Approximately how many man-hours
should it take to install two
200-kW diesel generators?
1.
10
2.
9
3.
7
4.
5
In the Facilities Planning Guide,
how are component site plans
represented?
1.
Construction drawing numbers
2.
NAVFAC drawing numbers
3.
CECOS drawing numbers
4.
NCF drawing numbers
Construction standards are grouped
into two classifications, initial
and temporary.
What is the
duration requirement for initial
construction?
1.
More than 16 weeks
2.
Less than 12 weeks
3.
More than 8 months
4.
Less than 6 months
3-44.
3-45.
3-46.
Fuel usage is computed for
installed engine-driven equipment
based on a requirement of how many
days?
1.
90
2.
60
3.
30
4.
10
How are facility drawings in volume
1, part 2 indexed?
1.
By facility number
2.
By drawing number
3.
By construction number
4.
By CESE number
What numbering system is used to
identify the Civil Engineer Support
Equipment needed to make a facility
functionally operational?
1. CESE
2.
ECC
3.
TOA
4.
ABIOL
IN ANSWERING QUESTION 3-47, REFER TO TABLE
4-1 OF THE TEXTBOOK.
3-47.
A facility is to be disassembled
and moved to another location and
reused.
What recoverability code
is assigned to this facility?
1. A
2. B
3. C
4. D
IN ANSWERING QUESTION 4-48, REFER TO
FIGURE 4-4 OF THE TEXTBOOK.
3-48.
3-49.
3-50.
How many construction electricians
are required to install assembly
number 32602?
1.
One
2. Two
3.
Three
4.
Four
When ordering a component, not in
your TOA, what authority must the
request go through?
1.
NAVFAC
2.
CNO
3.
CESCO
4.
OPNAV
In what publication is the Index of
Facilities listed?
1.
P-404
2.
P-307
3.
P-437
4.
P-315
16