draw connector lines. Figure 9-26 shows a typical precedence diagram for a 40-by- 100-foot rigid-frame building.
NOTE
Although the following references were current when this TRAMAN was published, their continued currency cannot be assured. You therefore need to ensure that you are studying the latest revision.
Facilities Planning Guide,
NAVFAC P-437, Naval Facilities Engineering Command, Alexandria, Va., 1982.
Operations Officers Handbook,
COMCBPAC/ COMCBLANTINST 5200.2A, Commander, Naval Construction Battalions, U.S. Pacific Fleet, Pearl Harbor, Hawaii, and Commander, Naval Construction Battalions, U.S. Atlantic Fleet, Norfolk, Va., 1988.
Seabee Planners and Estimators Handbook, NAVFAC P-405, Chapter 5, Naval Facilities Engineering Command, Alexandria, Va., 1983.