Table 1-4. - Seabee Project Package - Continued
| 4A | *Quality Control Plan Cover Sheet |
| *Quality Control Plan | |
| *Safety Plan Cover Sheet | |
| *General Safety Plan | |
| *Safety Plan | |
| *Environmental Plan | |
| 4B | Daily Quality Control Inspection Reports |
| Field Adjustment Request (FAR) Submittal Log | |
| FARs | |
| Request For Information (RFI) Submittal Log | |
| RFIs | |
| Design Change Directive (DCD) | |
| Concrete Placement Clearance Forms | |
| Pre-placement Photos for Concrete Placements | |
| Asphalt Pavement Clearance Forms | |
| Utility Interruption Request | |
| Excavation Request | |
| Road Closure Request | |
| Engineering Service Request | |
| Minerals Products Request | |
| Other QC Forms | |
| Daily Safety Inspection Reports | |
| Emergency Phone Numbers Navy Employee Report of Unsafe or Unhealthful Working Conditions | |
| Required Safety Equipment | |
| Daily Safety Lecture Log | |
| Accident/Near Mishap/Mishap Reports | |
| Highlighted 29 CFR 1926 | |
| Hazardous Materials Inventory Sheet | |
| Other Safety Forms | |
| SECTION #5 DRAWINGS/SPECIFICATIONS | |
| 5A | *Project Plans |
| **Highlighted Specifications | |
| 5B | Site Layout |
| Shop Drawings | |
| Detailed Slab Layout Drawings | |
| Forming Plans | |
| Rebar Bending Schedule | |
| Other Sketches/Drawings | |
| Technical Data |