Figure 1-20.—Framing for cantilevered joists.joists. When regular floor joists run parallel to theintended overhang, the inside ends of the cantileveredjoists are fastened to a pair of double joists (fig. 1-20).Nailing should be through the first regular joist into theends of the cantilevered joists. Framing anchors arestrongly recommended and often required by thespecifications. A header piece is also nailed to theoutside ends of the cantilevered joists.Butted over a GirderJoist ends can also be butted (rather than lapped)over a girder. The joists should then be cleated togetherwith a metal plate or wooden cleat, as shown inFigure 1-21.—Butting joists over a girder.Figure 1-22.—Butting Joists against a girder.1-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business