Figure 2-10. - Repair Parts Summary Sheet Sample
Figure 2-11. - Operators Inspection Guide and TroubleReport, NAVFAC 9-11240/13.
Consult COMCBPAC/COMCBLANTINST 11200.1 series for guidance regarding frequency of Type C PM scheduling.
NOTE Cost and availability of repair parts, as well as resources and working con- ditions, must be considered along with CESE commitments and conditions.
The Equipment Repair Order (ERO) (figs. 2-1 and 2-2) and the continuation sheet (fig. 2-3) are used in the NCF to record costs of repairs, hours required for repairs, and total time that equipment is out of service. The data will help the NCF in budget planning, determining life expectancies of equipment, and predicting future equipment and training requirements. The Naval Facilities Engineering Command Systems Office (FACSO), Port Hueneme, California, also uses the data to compile cost and utilization figures on each piece of USN-numbered equipment. Therefore, the data must be complete, accurate, and neatly recorded according to NAVFAC P-404 and COMCBPAC/ COMCBLANTINST 11200 series.
Continue Reading