During construction, the crew leader must keep all prints updated and every 2 weeks check with the engineering department to make sure they are making the same updates. At the close of the project, the battalion is required to turn in two sets of as-built (red-line) drawings to the ROICC. These drawings show how the project was actually constructed.
At the completion of your project use the pre-BOD checklist (fig. 2-33, page 1, and fig. 2-34, page 2) to
Figure 2-34.-Pre-BOD inspection request (page 2).