16. SAMMS camp maintenance application- generated turnover summary report.
17. SAMMS camp maintenance reference material and guides.
The outgoing battalion validates all camp records, reports, and status chart data 10 days before the start of turnover. A complete wall-to-wall inventory of MCD material in MLO is held to validate all BM and material status. The BRAVO company expediter will assist in the material inspection.
At the completion of the turnover, the relieving battalion provides a report to the 2ndNCB/3rdNCB on any major discrepancies and problem areas that cannot be resolved between the two battalions. A copy is provided to the 2ndNCB/3rdNCB DET.
Any change to the established procedures must be authorized by the 2ndNCB/3rdNCB. Other than a change in personnel, battalion turnovers should have no discernible effect on the maintenance system!