similar covering until needed. Parts making up theERECTIONrigid-frame assemblies should be laid out ready forFigure 9-2, view A, will help you identify theassembly and in position for raising.Always exercise care when unloading materials.various structural members of a PEB and theirRemember: Damaged parts can delay getting the joblocations. View B shows the placement of liner panels.done in the shortest possible time. To avoid damage,Each part serves a specific purpose and must belower the materials to the ground-don’t drop them.installed in the proper location to ensure a soundFigure 9-2.—Identification of the structural members (view A) and the liner panels (view B).9-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business