INDEX
A
Advance base field structures, 9-1
distribution and inventory, 9-5
field-type latrines, 9-13
pre-engineered building (PEB), 9-1
basic structural erection, 9-3
dissembly procedures, 9-10
foundations, 9-2
pre-erection work 9-2
preplanning work 9-1
SEA hut, 9-12
wood frame tents, 9-10
Aggregates, 7-2
Air compressors, 8-10
Aluminum paint, 8-3
Anchor bolts, 9-2
Applying plaster, 7-12
Asphalt shingles, 3-18
Asphalt-felt underpayment, 3-13
Attic scuttle, 1-40
B
Beads, comer and casing, metal framing, 5-5
Bituminous roofing materials, 3-21
Board lathe, 7-4
Bracing, wall framing, 1-17
Breakwaters and jetties, 10-12
Bulkheads, 10-14
C
Cantilevered joists, 1-8
Casement windows, 4-18
Ceiling and wall coverings, 5-1
Commercial/industrial hardware, 6-22
Concrete bearing piles, 10-6
Construction in the dry, 10-16
Cornices, 3-8
D
Door swings, 6-18
Doorframing, interior, 6-15
Double-hung windows, 4-17
Downspouts and gutters, 4-10
Drywall, 5-1
E
Enamel paint, 8-3
Epoxy paint, 8-3
Expansion joints, 1-33
Exterior doors, 4-12
F
Fiber glass shingles, 3-18
Fire stops, wall framing, 1-21
Flashing, 3-15
Flexible insulation, 5-20
Floor coverings, 6-1
Floor joists, 1-8
Framing square, 2-4
G
Gable roof, 2-1
Glass and glazing, types of, 4-21
Glass-fiber felt, 3-15
Groins, 10-14
Gypsum lath, 7-6
Gypsum plaster, 7-1
H
Header joists, 1-8
INDEX-1