5-19.
After all ingredients for plaster
have been added, what minimum time
should a mixing machine be allowed
to mix?
1.
7 min
2.
5 min
3.
3 min
4.
10 min
5-20.
Normally, what is the specified
flatness tolerance of a plastered
surface?
1.
1/16 in. in 4 ft
2.
1/8 in. in 10 ft
3.
1/4 in. in 8 ft
4.
1/2 in. in 16 ft
5-21.
What tool is used for carrying
mortar?
1.
A rectangular trowel
2.
A darby
3.
An angle trowel
4.
A hawk
5-22.
To improve adhesive bonds, what
tool should be used to make furrows
between coats?
1.
Darby
2.
Browning brush
3.
Cork float
4.
Scarifier
5-23.
On a typical plastering crew, which
of the following individuals
normally mixes the plaster?
1.
Crew leader
2.
Tender
3.
Plasterer
4.
Supervisor
5-24.
5-25.
526.
Which of the following statements
is applicable to the fog-spray
curing of portland cement plaster?
1.
The finish coat should be
applied at least 3 days after
the brown coat is applied
2.
The finish coat should be
spray-cured for 48 hours after
its application
3.
The brown coat should be
fog-sprayed for 48 hours
followed by the same treatment
for the scratch coat
4.
The scratch coat should be
fog-sprayed for 24 hours and
the brown coat fog-sprayed for
36 hours
A putty coat plaster finish is
ready for troweling at what point?
1.
When the angles have been
straightened
2.
When the surface has been
doubled back
3.
When the skim coat has been
applied
4.
When the plaster begins to set
and the surface becomes dull
Throwing plaster on a surface with
a brush produces which of the
following textures?
1.
Stippled
2.
Travertine
3.
Dash coat
4.
Pebble